ROVINJ

Station summaryPORE

  • More informations on each symbol.
  • GPS
    Tide Gauge
    DORIS
IGS-type acronym : PORE
Latitude : 45.22601300
Longitude : 13.59504100
Installed date : 2008-12-09
Decommissioned date :
Country : CROATIA
City: ROVINJ
Station status : active (green)
Distance to Tide Gauge (m) : 16069
Domes Nr.: 11907M001
Station operator: (SGA) - State Geodetic Administration
IGS-like station form :

GPS position times seriesPORE

SARI


Position
(Reference epoch: )




Offsets (mm)

MMaterial change or malfunction
EEarthquake
RFReference Frame change
UUnknown
NANot available
Position discontinuity
Velocity discontinuity
     
   
Vertical component
   
East component
   
North Component


Data available at SONELPORE



Quality plots on RINEX filesPORE

Quality plots on RINEX files of PORE Quality plots on RINEX files of PORE Royal Observatory of Belgium

Plots generated using software developed with the EPN team at ROB
Observations & tracking performance Satellite tracking

informations (this operation may take 20 to 45s)

The satellite tracking graph has been calculated for all stations for the first day of each month. If you wish to have a graph for another date, choose the 'Calculate a specific date' option.

Comparison with satellite altimetry data

Co-located instrumentsPORE

Photo albumPORE

BibliographyPORE

If you have a relevant reference to suggest, please send-us an e-mail : sonel@sonel.org
  • puce De-Biasio, Baldin et al., 2020. Revisiting Vertical Land Motion and Sea Level Trends in the Northeastern Adriatic Sea Using Satellite Altimetry and Tide Gauge Data. Journal of Marine Science and Engineering. Get this reference BibTeX of the reference
  • puce Filic, Filjar, 2019. GNSS Positioning Error Change-point Detection in GNSS Positioning Performance Modelling. TransNav, the International Journal on Marine Navigation and Safety of Sea Transportation. Get this reference BibTeX of the reference
  • puce Pajak, Kowalczyk et al., 2021. Studying the Sensitivity of Satellite Altimetry, Tide Gauge and GNSS Observations to Changes in Vertical Displacements. Geomatics and Environmental Engineering. Get this reference BibTeX of the reference

Log bookPORE

[EUREFmail-7882] - 2015-04-07 (08/04/2015)

Due to yearly maintenance on electrical infrastructure that our power supplier will perform on the location of CROPOS control center, EPN stations CAKO, DUB2, PORE, POZE and ZADA will be unavailable on 8th April 2015 from 8:30 to 14:00 hrs.