ARCACHON-EYRAC

Contributing agency

Station summaryFERR

  • More informations on each symbol.
  • GPS
    Tide Gauge
    DORIS
IGS-type acronym : FERR
Latitude : 44.64595000
Longitude : -1.24883600
Installed date : 2005-05-30
Decommissioned date : 2016-08-29
Country : FRANCE
City: ARCACHON-EYRAC
Station status : Decommissioned (white and red cross)
Distance to Tide Gauge (m) : 7079
Domes Nr.: 10087M001
Station operator: Unknown
IGS-like station form :

GPS position times seriesFERR

SARI


Position
(Reference epoch: )




Offsets (mm)

MMaterial change or malfunction
EEarthquake
RFReference Frame change
UUnknown
NANot available
Position discontinuity
Velocity discontinuity
     
   
Vertical component
   
East component
   
North Component


Data available at SONELFERR



Quality plots on RINEX filesFERR

Quality plots on RINEX files of FERR Quality plots on RINEX files of FERR Royal Observatory of Belgium

Plots generated using software developed with the EPN team at ROB
Observations & tracking performance Satellite tracking

informations (this operation may take 20 to 45s)

The satellite tracking graph has been calculated for all stations for the first day of each month. If you wish to have a graph for another date, choose the 'Calculate a specific date' option.

Co-located instrumentsFERR

Photo albumFERR

BibliographyFERR

If you have a relevant reference to suggest, please send-us an e-mail : sonel@sonel.org
  • puce D'Anna, Idier et al., 2020. Impact of model free parameters and sea-level rise uncertainties on 20-years shoreline hindcast: the case of Truc Vert beach (SW France). Earth Surface Processes and Landforms. Get this reference BibTeX of the reference
  • puce Dodet, Bertin et al., 2019. Characterization of Sea-level Variations Along the Metropolitan Coasts of France: Waves, Tides, Storm Surges and Long-term Changes. Get this reference BibTeX of the reference
  • puce Le Cozannet, Bulteau et al., 2019. Quantifying uncertainties of sandy shoreline change projections as sea level rises. Scientific Reports. Get this reference
  • puce Poirier, Gravelle et al., 2018. Contrôles du marégraphe d'Arcachon - Mission du 12 au 15 juin 2018.. SONEL Nr. 001/18. Get this reference

History of the stationFERR

Cette station a été installée en 2005 par le CETMEF en charge de sa gestion et inétegrée au RGP. Elle fait partie du réseau DGPS de 7 stations pour fournir des corrections aux navires (source 2002). Nous supposons que ce service est toujours assuré en 2019.

Log bookFERR

2018/06/13 (17/01/2019)

Visite d'une équipe SONEL, SHOM, IGN, LIENSs reçue par les Phares et Balises au phare du cap Ferret pour effectuer un repérage en vue de rétablir la connexion de cette station et/ou prévoir sa modernisation.