THULE

Station summaryTHU2

GNSS-IR
  • More informations on each symbol.
  • GPS
    Tide Gauge
    DORIS
IGS-type acronym : THU2
Latitude : 76.53700000
Longitude : -68.82500000
Installed date : 1998-10-26
Decommissioned date :
Country : GREENLAND (DENMARK)
City: THULE
Station status : active (green)
Distance to Tide Gauge (m) : 403
Domes Nr.:
Station operator: Unknown
IGS-like station form :

GPS position times seriesTHU2

SARI


Position
(Reference epoch: )




Offsets (mm)

MMaterial change or malfunction
EEarthquake
RFReference Frame change
UUnknown
NANot available
Position discontinuity
Velocity discontinuity
     
   
Vertical component
   
East component
   
North Component


Data available at SONELTHU2



Quality plots on RINEX filesTHU2

Quality plots on RINEX files of THU2 Quality plots on RINEX files of THU2 Royal Observatory of Belgium

Plots generated using software developed with the EPN team at ROB
Observations & tracking performance Satellite tracking

informations (this operation may take 20 to 45s)

The satellite tracking graph has been calculated for all stations for the first day of each month. If you wish to have a graph for another date, choose the 'Calculate a specific date' option.

Co-located instrumentsTHU2

Log bookTHU2

[IGSSTATION-7976] - 2020-06-10 (11/06/2020)

Hourly and daily RINEX V3 files are now available from QAQ1, SCOR and THU2 beginning from Day 2020-161.

[IGSSTATION-7915] - 2020-03-20 (23/03/2020)

THU2 (JAVAD SIGMA) has been firmware updated to LATEST version 3.7.9, and a new sitelog is submitted.

The update is needed in order to be able to execute the GREIS commands mentioned in message:



‘[IGSSTATION-7914] URGENT Javad receiver tracking command for new GPS III satellite’

[IGSSTATION-7865] - 2020-02-05 (17/03/2020)

THU2 firmware is updated from 3.6.15 to 3.6.16.

[IGSSTATION-7611] - 2019-03-30 (26/04/2019)

We are unable to provide data for the time being, but hope to resume operation soon.

[EUREFmail-9633] - 2018-11-22 (11/12/2018)

THU2 and THU3 are currently unable to track, probably due some kind of damage to the antenna cable. We are relying on local personnel to investigate and do repairs if needed.

[EUREFmail-9619] - 2018-11-07 (08/11/2018)

Cable repairs are completed and data flow has been resumed for our sites (QAQ1, SCOR, THU2, THU3).

[EUREFmail-9617] - 2018-11-06 (08/11/2018)

Today all the fiber cables to our server room was cut under construction work on campus. This will cause data outage for all of our sites (QAQ1, SCOR, THU2, THU3), for an unknown period of time - probably several days.

[IGSSTATION-7419] - 2018-09-21 (02/10/2018)

An error in the sitelog (receiver firmware) has been corrected. The firmware was listed as “4.30.063”, and has been changed to “4.30/6.525”.

[IGSSTATION-7411] - 2018-09-05 (13/09/2018)

THU2 (LeicaGrx1200) has been replaced by a Leica GR25 as of DOY 241.



An error in the rinex header (Wrong receiver type and serial no.) for files through DOY 241 to 246 has been corrected, and new files are uploaded as well as a new sitelog.

[IGSSTATION-7339] - 2018-06-18 (19/06/2018)

Unfortunately there is a TOTAL internet breakdown on the Thule Air Base (THU2, THU3) as from yesterday Sunday June 17th, and it is not expected to be operational again sooner than Friday June 22nd.