WEST-TERSCHELLING

Station summaryTERS

Showing all stations within 1000 km of the observed station Active station No data for 30 days Decommissioned No observations in SONEL (Survey) Not co-located with observed station
Showing all stations within 1000 km of the observed station Available data / Station OK Available data / Problem(s) detected Does not work No longer exists Foreign partner management Not co-located with observed station
Showing all stations within 1000 km of the observed station Co-located with observed station Not co-located with observed station
  • More informations on each symbol.
  • GPS
    Tide Gauge
    DORIS
IGS-type acronym : TERS
Latitude : 53.36280000
Longitude : 5.21940000
Installed date : 1996-10-30
Decommissioned date :
Country : NETHERLANDS
City : WEST-TERSCHELLING
Station status : active (green)
Distance to Tide Gauge (m) : 10
Domes Nr.: 13534M001
Station operator: Unknown
IGS-like station form :

GPS position times seriesTERS



Position
(Reference epoch: )




Offsets (mm)

MMaterial change or malfunction
EEarthquake
UUnknown
Position discontinuity
Velocity discontinuity
     
   
Vertical component
   
East component
   
North Component


Data available at SONELTERS



Quality plots on RINEX filesTERS

Quality plots on RINEX files of TERS Quality plots on RINEX files of TERS Royal Observatory of Belgium

Plots generated using software developed with the EPN team at ROB
Observations & tracking performance Satellite tracking

informations (this operation may take 20 to 45s)

The satellite tracking graph has been calculated for all stations for the first day of each month. If you wish to have a graph for another date, choose the 'Calculate a specific date' option.

Comparison with satellite altimetry data

Co-located instrumentsTERS

Photo albumTERS

Log bookTERS

[IGSSTATION-7427] - 2018-10-05 (08/10/2018)

Due to work on the network switches the Local Data Center in Delft will be unavailable on Saturday October 6, 2018, starting at 08:00 LT (06:00 UTC) in the morning. We expect to be up and running again later in the afternoon on Saturday Oct 6.



During this period there will be no data available through ftp or http. Also, no files will be uploaded to IGS and EPN data centers. However, the LDC will still be able to accept incoming data, and also NTRIP data streams should be unaffected (only the NFS mounts to the data are affected).