"The bench mark is a disk set flush in Scripps Pier dock directly above concrete piling #17 about midway along the Scripps Pier, 186 m (610 ft) east of the offshore end of the pier, 150 m (492 ft) west of the inshore end of the pier, 6.50 m (21.3 ft) north of the south edge of the pier, and 0.3 m (1 ft) south of the north edge of the pier."
11/12/2023 |
NOAA |
941 0230 S |