RANGIROA

Contributing agency

Station summaryRGTG

GNSS-IR
  • More informations on each symbol.
  • GPS
    Tide Gauge
    DORIS
IGS-type acronym : RGTG
Latitude : -14.94581200
Longitude : -147.70604500
Installed date : 2009-02-26
Decommissioned date : 2021-02-25
Country : FRANCE
City: RANGIROA
Station status : Decommissioned (white and red cross)
Distance to Tide Gauge (m) : 1
Domes Nr.: 92501M002
Station operator: GOP Contact
IGS-like station form :

GPS position times seriesRGTG

SARI


Position
(Reference epoch: )




Offsets (mm)

MMaterial change or malfunction
EEarthquake
RFReference Frame change
UUnknown
NANot available
Position discontinuity
Velocity discontinuity
     
   
Vertical component
   
East component
   
North Component


Data available at SONELRGTG



Quality plots on RINEX filesRGTG

Quality plots on RINEX files of RGTG Quality plots on RINEX files of RGTG Royal Observatory of Belgium

Plots generated using software developed with the EPN team at ROB
Observations & tracking performance Satellite tracking

informations (this operation may take 20 to 45s)

The satellite tracking graph has been calculated for all stations for the first day of each month. If you wish to have a graph for another date, choose the 'Calculate a specific date' option.

Co-located instrumentsRGTG

Photo albumRGTG

BibliographyRGTG

If you have a relevant reference to suggest, please send-us an e-mail : sonel@sonel.org
  • puce Lannuzel, 2011. Réseau de marégraphes dans le Pacifique. Annales Hydrographiques. Get this reference
  • puce Xianjie-Li, Jean-Pierre-Barriot et al., 2023. Monitoring absolute vertical land motions and absolute sea-level changes from GPS and tide gauges data over French Polynesia. Geodesy and Geodynamics. Get this reference BibTeX of the reference

History of the stationRGTG

Installed in 2009.
Removed the 25th of Februray 2021 due the renovation of Avatoru Harbour

Log bookRGTG

2021-02-23 (19/05/2021)

A Shom mission took place at Rangiroa from 23 to 26 of Februray 2021. TG and GNSS station have been totally removed prior to renovation work at Avatoru Harbour. E.Poirier.

2020-06-12 (16/06/2020)

Pacific group of SHOM (GOP) has warned us that construction works will be started during the second semestre of 2020 at Avatoru quay in Rangiroa.
This will probably require the total demolition of the actual tide gauge shelter. Therefore this means the interruption of all TG and GNSS recordings until the construction of a new observatory.

Schedule will be:
- second half of 2020: construction work at Avatoru cargo quay. This will probably impact benchmark RGR-11. It will last 15 month.
- 2021: construction work will take place at tide gauge site. This means total interruption of sea-level and GNSS records.

E. Poirier - LIENSs - University of La Rochelle.