ROSCOFF

Contributing agency

Station summaryROTG

GNSS-IR
  • More informations on each symbol.
  • GPS
    Tide Gauge
    DORIS
IGS-type acronym : ROTG
Latitude : 48.71844300
Longitude : -3.96566400
Installed date : 2009-08-26
Decommissioned date :
Country : FRANCE
City: ROSCOFF
Station status : active (green)
Distance to Tide Gauge (m) : 2
Domes Nr.: 19938M001
Station operator: (LIENSs - OASU) - LIENSs - OASU
IGS-like station form :

GPS position times seriesROTG

SARI


Position
(Reference epoch: )




Offsets (mm)

MMaterial change or malfunction
EEarthquake
RFReference Frame change
UUnknown
NANot available
Position discontinuity
Velocity discontinuity
     
   
Vertical component
   
East component
   
North Component


Data available at SONELROTG



Quality plots on RINEX filesROTG

Quality plots on RINEX files of ROTG Quality plots on RINEX files of ROTG Royal Observatory of Belgium

Plots generated using software developed with the EPN team at ROB
Observations & tracking performance Satellite tracking

informations (this operation may take 20 to 45s)

The satellite tracking graph has been calculated for all stations for the first day of each month. If you wish to have a graph for another date, choose the 'Calculate a specific date' option.

Co-located instrumentsROTG

Titre du document Vignette
ROTG- Mast and antenna Vignette : ROTG- Mast and antenna
(1 Mo)
ROTG- Antenna - Azimuth 180° Vignette : ROTG- Antenna - Azimuth 180°
(915 Ko)
ROTG- Antenna - Azimuth 270° Vignette : ROTG- Antenna - Azimuth 270°
(956 Ko)
ROTG- Antenna - Azimuth 0° Vignette : ROTG- Antenna - Azimuth 0°
(745 Ko)
ROTG- Antenna - Azimuth 90° Vignette : ROTG- Antenna - Azimuth 90°
(753 Ko)
ROTG- Benchmark Vignette : ROTG- Benchmark
(3 Mo)
ROTG- Shelter Vignette : ROTG- Shelter
(1 Mo)
ROTG- Shelter 2 Vignette : ROTG- Shelter 2
(1 Mo)
ROTG- Site overview Vignette : ROTG- Site overview
(2 Mo)
ROTG- GNSS receiver Vignette : ROTG- GNSS receiver
(747 Ko)
ROTG- airbone image Vignette : ROTG- airbone image
(277 Ko)
Cliquer sur le titre ou la vignette pour télécharger le document

BibliographyROTG

If you have a relevant reference to suggest, please send-us an e-mail : sonel@sonel.org
  • puce Bardière, 2009. Installation d'une station GPS permanente (ROTG) au marégraphe de Roscoff et contrôle du marégraphe - 25 août 2009 . Get this reference
  • puce Dodet, Bertin et al., 2019. Characterization of Sea-level Variations Along the Metropolitan Coasts of France: Waves, Tides, Storm Surges and Long-term Changes. Get this reference BibTeX of the reference

History of the stationROTG

The main rationale for the GPS installation in 2009 at the tide gauge is its proximity (about 1.5 km) to the ground track of the former Topex/Poseidon and current Jason radar altimetry satellites.

Log bookROTG

2020/06/07 (08/06/2021)

ROTG streaming now goes through 3G wireless connection instead of ADSL. Remote access is not operational but will be restored.

2020/10/14 (14/10/2020)

Shom is planning to install a new tide gauge central at Roscoff on Wednesday 2020-10-14. This station comes with a new router ETIC that will replace Westermo. Thi change may affect GNSS data streaming.

2020/08/27 (27/08/2020)

Data streaming is stopped by IGN because a new position of the station must be calculated. This is to take in account the new antenna type and calibration.
Streaming will come back in 3 weeks time.
E.Poirer

2020/08/21 (26/08/2020)

Router westermo needed a reboot. Now ROTG is sending raw data to IGN and ENSG.
E.Poirier, Y-T.Tranchant.

2020/08/20 (26/08/2020)

Field intervention has been carried out at ROTG station with great success.
Antenna TopCON PGA1 was dead Gue to rain water ingress. It has been replaced by a Trimble Zephyr geodetic 2. The centering plate has been replaced too and is now 6mm thick stainless steel.
Levelling from antenna ARP to Benchmark has been carried out. New sitelog is published. Receiver firmware is updated. E.Poirier, Y-T.Tranchant.

2020/01/29 (28/07/2020)

Intervention at Roscoff GNSS station. Topcon GB1000 has been successfully replaced by a Septentrio Polarx5 at 16:59 UTC.
E.Poirier

2020/07/28 (28/07/2020)

ROTG station has been checked by our local contact D. Nedelec. Nothing anormal has been spotted. It confirms the diagnostic of an antenna breakdown. E.Poirier.

2020/07/28 (28/07/2020)

ROTG GNSS station is down since session 2020-206o (24th of July).

New receiver Septentrio Polarx5 was installed the 29th of January 2020.
According to Sonel database, the day the receiver was changed, cycle slips increased from 150 to 20 000. Number of observations increased from 40 000 to 80 000. Ratio observed/predicted dropped down from 80 to 20%.
According to RGP website ROTG station seemed to be working fine until day 66 when the ratio observed/preditced started to decline slowly. It declined quickly on day 165 to reach 30% which is very poor.

We suppose a GNSS antenna breakdown. There seem to be a dysfunctioning in the couple Septentrio Polarx5 / TopCon PGA1.
We plan to replace the antenna as soon as possible.

E. Poirier

[RGPmail] - 2020-02-03 (04/02/2020)


Les données des stations ROTG (29, Finistère) SMTG (35, Ille-et-Vilaine) TLTG (83, Var) sont de nouveau disponibles depuis les sessions 029r, 030r et 029a respectivement.

Les données manquantes ne pourront pas être récupérées.

2019-08-21 (21/08/2019)

Panne de la station du jour 225 (13 août) au jour 230 (18 août) inclus. Cause inconnues mais panne simultanée à SMTG, matériel identique.

2019/03/06 (15/05/2019)

Les données brutes 1h/1s de ROTG et SMTG sont a présent envoyées directement vers le RGP qui se charge de Rinexer. Nous ne produisons plus de Rinex à SONEL. Nous allons chercher les fichiers jour/30s sur le site du RGP directement.
E.Poirier

2019/05/15 (15/05/2019)

Les données brutes 1h/1sec *.tps de ROTG ont été sauvées et uploadees sur sonelprod de la session 413p (13 avril 2019 15:00 - 16:00 UTC) à la session 425m (25 avril 12:00-13:00 UTC). L'installation est revenue en fonctionnement normal le 25 avril à la session 425n (13:00-14:00 UTC).

Les données sont perdues définitivement du jour 097 session a (7 avril 2019 00:00 UTC) au jour 103 session o (13 avril 2019 15:00 UTC). Soit 6 jours et 15 heures perdues.

E. Poirier

11/07/2018 : Intervention à la station GNSS ROTG. Reboot du récepteur (14/05/2019)

Le 11 juillet 2018, jour 192, Dominique Nedelec du port de Roscoff est intervenu sur le récepteur GB1000 de ROTG en panne depuis le 7 janvier 2018.
Il était écrit 'CONNECTION FAILED' sur l'écran du GB1000 à son arrivée. Il a constaté aussi que le câble réseau entre le récepteur et le westermo était très tendu. Guidé par téléphone, il a redémarré le récepteur. Aucun fichier n'a été récupéré. L'enregistrement semble depuis revenir à la normale. E.Poirier

2019/05/10 (14/05/2019)

ATTENTION!!
Changement du numéro de série de l'antenne GNSS dans la section 4.1 du site log.
***L'antenne n'a pas changé sur place, c'est toujours la même.***
Cependant, c'était le S/N 310-0972 qui correspond à la Ground Plane (GP) qui était inscrit dans le sitelog or le S/N de l'antenne PGA1 est 308-7949, vérifié sur place en avril 2019 par photo.
C'est donc 308-7949 qui a été mis. Plusieurs changements de sitelog ont été fait faits sur M3G par erreur. Seul le dernier a été mis sur SONEL.
E.Poirier

2019/04/25 (14/05/2019)

Mission sur place:
Mise à jour du firmware de GB1000 car le récepteur est en panne depuis le 6 avril.
La version 3.5p5 remplace la 3.3p6 (Main 3.02U).
Toutes les données du GB1000 sont téléchargées sur le mac par ftp.
Reconfiguration de l'enregistrement par GRIL.
E.Poirier

06/04/2019 (12/04/2019)

La station GNSS ROTG est tombée en panne au moment du GPSweek rollover. Le firmware 3.3 de la carte EGGT est trop vieux. Il faut installer un firmware 3.5p5. La station est déclarée en panne par le RGP. E.Poirier.

26/03/2010: Automatic daily download operational (29/03/2010)

Automatic download of GPS observations are now performed daily thanks to the ADSL line provided by SHOM, shared with the tide gauge. RINEX files are available at ftp.sonel.org (anonymous FTP).

26/08/2009: Installation of the GPS station (14/10/2009)

Monumentation and antenna were installed end of August. The receiver started recording on 26/08/2009. However, there is no remote telecommunication yet. In the meantime, regular manual downloads of the data files are scheduled every trimesters or so.