ILE ROYALE

Contributing agency

Station summaryIROY

GNSS-IR
  • More informations on each symbol.
  • GPS
    Tide Gauge
    DORIS
IGS-type acronym : IROY00GUF
Latitude : 5.28467713
Longitude : -52.58675203
Installed date : 2022-05-18
Decommissioned date :
Country : FRANCE
City: ILE ROYALE
Station status : active (green)
Distance to Tide Gauge (m) : 2
Domes Nr.: 97309M002
Station operator: (DM-GUYANE) - Service des Phares et Balises de Guyane (IGN) - Institut National de l'Information Géographique et Forestière
IGS-like station form :

Data available at SONELIROY



Quality plots on RINEX filesIROY

Quality plots on RINEX files of IROY Quality plots on RINEX files of IROY Royal Observatory of Belgium

Plots generated using software developed with the EPN team at ROB
Observations & tracking performance Satellite tracking

informations (this operation may take 20 to 45s)

The satellite tracking graph has been calculated for all stations for the first day of each month. If you wish to have a graph for another date, choose the 'Calculate a specific date' option.

Co-located instrumentsIROY

Photo albumIROY

BibliographyIROY

If you have a relevant reference to suggest, please send-us an e-mail : sonel@sonel.org
  • puce DONAL, 2024. Rénovation de la station GNSS de l’île Royale Guyane, mai 2022. Compte rendu IGN, DT 60082 8730.
  • puce Thiéblemont, Le-Cozannet et al., 2023. Chronic flooding events due to sea-level rise in French Guiana. Scientific Reports. Get this reference BibTeX of the reference

History of the stationIROY

Cette nouvelle station IROY succède à IRYL suite au remplacement du mât en inox support de l’antenne GNSS par une équipe de l'IGN.

Log bookIROY

[SHOMmail] 2024-10-10 (04/11/2024)

No data and no communication with the station.
October 15, 2024 : Unsuccessful intervention by the Hydrographic surveyor of Phares et Balises.
October 31 , 2024 : The Phares et Balises informs us that they have change 4G operator. The router must be changed by the SHOM people.

Waiting for news from SHOM

[RGPmail] 2024-08-11 (04/11/2024)

No data and no communication with the station.
Hydrographic surveyor of Phares et Balises had done an intervention.
August 20 , 2024 : the station is operating again. Data loss during the cut.

2024-04-04 (04/11/2024)

No data and no communication with the station.
Hydrographic surveyor of Phares et Balises investigated and found that the general circuit breaker at the start of the quay was cut. They turned it back ON and the station was powered up again.
April 09 , 2024 : the station is operating again. No data loss!